Report Contingency Plan for Potable Water Supply Socialist mayor, and Cooperative Association Hidrosuroeste COOCISFRONT


* Procedure for the distribution of water:

-communities previously recorded for the allocation of tanks

, then the trucks fuel tanks are filled

"Then a member of Common Council, goes on the truck to fill water tank, located in the plant-then hidrosuroeste

community council members with the tanker, distributed in an equitable manner the water for a period three minutes.

"The drinking water is governed by the conditions hydraulic and operational pipeline, any low water flow from the ground lamb and drain along the main adduct is reflected in the provision of municipal Pedro Maria Ureña and Bolivar to be located in the tail of the aqueduct.

NOTE: THE PILLARS Aqueduct suspended the supply of 7 and 8 May due to heavy rains, dam catchment increased turbidity and sediment transport. thru of problems at the main valve 10 'point of passage of water present communities failure of the gate, leaving service sectors San Isidro, El Cuji, La Residence, Bolivarian bottom, May 23, and Antonio José de Sucre, is expected to be completed the repair work next Friday May 13th in the afternoon to start pumping on Saturday 14May if God and weather permitting, at a meeting of the Mayor's balance - Hidrosuroeste Ureña.